Methodology, Mathematical Formulas & Sourced Data
1. Primary Source Audits & Legal Documentation
Every quantitative value presented across this monitor originates from one of four verified documentary sources:
- Energy Audit Report (Year 2020): Authored by Dr. K. Palanisamy (BEE Certified Energy Auditor EA3024, Associate Professor, Dept. of Energy and Power Electronics, School of Electrical Engineering, VIT). Covers 33 kV incoming lines, transformer allocations, 30-month billing ledgers (Jan 2019 – Jun 2021), 10-year generation history (2014–2021), and District Cooling engineering calculations.
- Green Audit Report (Period: June 2022 to August 2023): Prepared by Eco Services India Private Limited (NABET/QCI Accredited EIA Consultant No. NABET/EIA/24-27/RA 0332). Contains campus layout land classifications, tree species census, rooftop solar monitor telemetry, water usage registers, and 12-powerhouse equipment ledgers.
- Environmental Audit Report (Period: September 2023 to August 2024): Prepared by Eco Services India Private Limited. Provides statutory compliance documentation, TNPCB Consent to Operate (CTO Expansion Order No. 2307250173231), 31 DG set stack heights, 7,233 KLD water balance, and the 2024 certified greenhouse gas footprint.
- MDP Student Field Notes & Inspection: Campus observations documenting heavy lab power consumers (SMEC thermal rigs, SELECT machinery, CFM cleanrooms, CBST freezers) and point-source CO₂ combustion exhausts.
2. Mathematical Formulations & Modelling Logic
Because room-level and lab-level IoT energy sub-meters do not exist campus-wide, local hotspot intensities are transparently calculated using the following engineering approximations:
A. Electrical Load Estimation (kW)
For unmetered academic towers, peak electrical load \(P_{\text{est}}\) is estimated from connected transformer capacity and operational load factors:
Where \(S_{\text{tr}}\) is the dedicated transformer capacity (e.g. 1,600 kVA for Tech Tower, 2,000 kVA for Pearl Research Park), \(\cos(\phi) = 0.99\) (maintained via thyristor-switched APFC capacitor banks as per Green Audit p. 47), and \(LF_{\text{diversity}}\) is the measured diversity factor (0.50 to 0.65).
B. Carbon Dioxide Sequestration (Forest & Open Land)
Campus absorption figures follow empirical forestry formulas adopted in Environmental Audit 2024 (p. 20):
- Canopy Trees: 18.69 acres (75,649 m²) @ 100 t CO₂/acre/year = 1,869.00 t/year
- Open Porous Land: 6,31,928 m² @ 1.0 × 10⁻⁶ mol CO₂/(m²·s) = 876.00 t/year
- Lawns & Shrubs: 35.60 hectares @ 1.95 t CO₂/ha/year = 69.44 t/year
- Total Annual Natural Sequestration: 2,814.44 t CO₂/year
C. Scope 1 Combustion & Scope 2 Grid Emissions
Calculated using standard IPCC emission factors applied by Eco Services India:
E_net = E_gross − Absorption_campus
3. Sourced External Datasets (Open APIs)
- Open-Meteo Historical Climate API: Hourly and monthly ERA5-Land reanalysis dataset (no API key required) for coordinates 12.9692° N, 79.1559° E. Cached locally in
/data/vellore_climate_historical.jsonto ensure full offline functionality. - Open-Meteo Air Quality API: Ambient air pollution parameters (PM2.5, PM10, NO₂, SO₂, CO, AQI). Cached locally in
/data/vellore_air_quality_cache.json. - OpenStreetMap (Nominatim & Overpass): Campus geographical perimeter, building footprints, and Katpadi road network. Cached in
/data/campus_osm_boundary.json.